How many actual working days are in your leave, deadline or project window? Enter two dates to split the period into total days, working days and weekend days.
The calculator above counts Monday to Friday only. If you need public holidays subtracted as well, use the country versions: the Working Days Calculator for Europe covers 20 countries — including Germany, France, Spain and the United Kingdom — each with its complete 2026 public holiday list built in.
Yes — the count includes both dates, which is how leave and deadline periods are usually counted.
No — holidays differ by country and company, so only Saturdays and Sundays are treated as weekend days. Subtract your local holidays from the working-days figure if needed.
No problem — the two dates are sorted automatically.
The calculator walks through the range one calendar day at a time, starting at the first date and including both the start and the end date in the count. Every day it lands on is added to the total; days that fall on a Saturday or a Sunday (day 6 and day 0 in the code's week) are counted as weekend days, and every other day — Monday to Friday — is counted as a working day. If you enter the end date before the start date, the two are swapped automatically so the count always runs forwards. No public holidays are subtracted, because they differ by country.
Formula: Working days = total days in the inclusive range − Saturday and Sunday days in the range.
Inputs: Start date: Monday, November 2, 2026; end date: Friday, November 13, 2026.
Steps: The inclusive range holds 12 days. One full weekend falls inside it — Saturday 7 and Sunday November 8 — which is 2 weekend days. Working days = 12 − 2 = 10.
Result: Working days (Mon–Fri): 10 — out of 12 total days, with 2 weekend days.
Saturday and Sunday only — that is the rule built into the calculator. If your workplace or country observes a different weekend, count the range here first and then adjust for the difference by hand.
Up to a little over 100 years. The calculator counts day by day and stops with an error if the range passes about 36,600 days, which keeps accidental enormous ranges from being processed.
It defaults to today, so entering only a start date tells you the working days from that date up to now — useful for checking how many working days a project has already taken.
A total of 1 day. If that day is a weekday it counts as 1 working day; if it is a Saturday or Sunday it counts as 0 working days and 1 weekend day.
Yes. Ranges can span months and years freely — December into January, or several years at once. Because the count follows the real calendar day by day, month lengths and leap years are handled automatically.
Add this calculator to your own website or blog — it is completely free, needs no sign-up, and always shows the latest version. Copy the code below and paste it into your page where you want the calculator to appear. Keeping the small “Powered by Loona Automation” credit line under the embed helps keep this tool free — but you are free to style or remove it; the tool works either way.